Building is under construction and will be ready by March 2025. A New Development Of Efficient And Functional Industrial Units Is Currently Underway At Wellington St/Leslie St In Aurora. The Location Of This Development Is Excellent, Situated Back To Smart Center, With Modern Features And A Projected Occupancy Date Of Q1 2025. Occupants Will Enjoy Easy Access To Highway 404 From Wellington St, Which Is Only A Minute Away. The Units Will Be Built Using R15 Architectural Precast AndGlazed Units In The Front Area And Feature Double-Glazed Aluminum Entrance Doors, Along With Clearstory Windows In The Warehouse Area,Providing A Lot Of Natural Light. With A Clear Height Of 28 Feet, The Units Offer Considerable Storage Potential For Future Use. Additionally, Each UnitWill Come With One Built-In Truck Level Dock Equipped With An Electrical Dock Leveler, And A Second Potential Truck Level Dock That Can Be Easily Installed After The Closing.
Read More